Saturday, November 22, 2025

Shelf Work, New Frame, TMG4 Mixing

A day of technical challenges.

First I clamped and glued the base and sides to the new shelves. The base was placed flat, with a spacer, then the loose top, this made a sandwich wide enough for the band clamp. The sides (after first drilling and countersinking pilot holes for future screws) were then placed vertically and band clamped to the base. The advantage of vertical assembly like this is that the floor is very flat, but the sides needed temporarily holding up before the clamp was tightened. When tight, everything was laid flat and the angles checked, with slight adjustments made to the tops of the verticals to make them exact right angles as it all dried. This may be overkill for mere shelves, but it will be as accurate as any other thing in the house.

Only this joint is glued, the rest will be done, joint by joint, in contrast to the first version of the shelves when everything was glued and clamped at once.

Then, removing the old shelves from the wall. On the floor they didn't sag, so the wood was not bent, but heavy under its own weight alone. My error was using wood which was too thin for the length of shelf; I made my priority a low weight, not strength. For the box shelves below, I've decided on the simplest solution of a leg to the floor. These shelves appear to be bent, rather than merely sagging, so I've applied a wedge to gradually bend back up to flat. I still consider these a first version to be replaced one day.

Then, work on a picture frame which must surround a stretched canvas. A rare job, I don't often use stretched canvas, and have hardly ever made a flush frame like this. The frame is cut, about 1 or 2mm larger than the canvas. I'll pin then staple it in place I think.

In the evening, more mixing on the new Modern Game. These songs were not written with my voice in mind and from the outset this has complicated everything. Still, this iteration will certainly sound better than any of the others.